New Sod Care

OKC Watering Variance for New Sod: How to Water Every Day

By Carlos Ochoa, Angel & Sons Sod Business · · Updated

Newly laid Tahoma 31 Bermuda sod on both sides of a front walkway, from one of our jobs

Do you need a watering variance to water new sod every day in OKC?

Oklahoma City has a permanent odd/even watering schedule, but new sod needs water every day for its first weeks. The City's Watering Variance Program lets you water a newly installed lawn daily. Apply before your install date: review can take up to 15 days, and a variance cannot be backdated.

How does lawn watering work in Oklahoma City?

Lawn watering in Oklahoma City follows a permanent odd/even schedule. Addresses ending in an even number water on even-numbered dates, and addresses ending in an odd number water on odd-numbered dates. For example, a house at 1400 waters on the 2nd, 4th and 6th; a house at 1401 waters on the 1st, 3rd and 5th.

From our jobs

Front yard before: bare graded dirt in front of the new home in GuthrieBEFORE
Same front yard after: new Astro Bermuda sod getting its first wateringAFTER
Before and after: 8,000 sq ft of Astro BermudaA recent job: Astro Bermuda in Guthrie, October 2026See the full job

Why does new sod need daily water?

We recommend watering new sod right after it is laid, then watering daily for several weeks, keeping the top 1 to 2 inches of soil moist until the grass roots in. Never lay sod on dry soil — wet the ground several days before the sod arrives.

How do you make a water variance request in Oklahoma City?

Fill out the newly installed landscape application on the City's Watering Variance Program page, before your install date. Review can take up to 15 days, most requests are done within a week, and you get an email with your variance number. Step by step:

  1. Make sure your water comes from Oklahoma City Utilities. If your water bill comes from a different city or water provider, check that provider's rules instead.
  2. Fill out the newly installed landscape application on the City's Watering Variance Program page.
  3. Wait for review — up to 15 days, most within a week.
  4. You will get an email with your variance number. Post it where it can be seen for as long as the variance is active.
  5. Schedule your install after you have the variance.

What does the City not approve?

Oklahoma City does not approve requests based on personal convenience, such as mowing schedules or preferred watering days, or requests where the irrigation controller is broken or can't be set to the required schedule.

How long does the variance last?

The City's page does not say. For questions, the City lists waterconservation@okc.gov.

What about other cities?

Rules change, especially in drought. In August 2026, Edmond moved to Stage 2 (lawn watering two days a week) and Deer Creek banned irrigation systems while still allowing hand watering. Oklahoma City stayed on its odd/even schedule. Check your own city's current rules before your install.

What we do on install day

When we do your sod installation, we give the sod its first watering and leave you written watering instructions. Questions? See our Services page or contact us. Planning your timing? Read about the best time to lay sod in Oklahoma. For the full day-by-day plan, read How to Water New Sod in Oklahoma: The First 30 Days

Sources

Frequently asked questions

Do I need a variance to water new sod every day in Oklahoma City?
Oklahoma City is on a permanent odd/even watering schedule. To water a newly installed lawn every day, the City offers a watering variance for new landscapes.
How long does the OKC watering variance take?
Review by the City can take up to 15 days, and most requests are done within a week.
Can the variance be backdated?
No, an Oklahoma City watering variance cannot be backdated, so apply before your install date.
What are the lawn watering days in Oklahoma City?
Oklahoma City is on a permanent odd/even schedule: addresses ending in an even number water on even-numbered dates, and addresses ending in an odd number water on odd-numbered dates.
How do you make a water variance request in Oklahoma City?
Fill out the newly installed landscape application on the City's Watering Variance Program page before your install date. Review can take up to 15 days, and you get an email with your variance number.
Does the OKC variance apply if I live outside Oklahoma City?
The variance is an Oklahoma City program. If your water comes from another city, check that city's own watering rules before your sod is installed.